There are hundres of windows and doors in the model and if i just delete the door or window the opening disappears with it.
Revit replace window with door phasing.
For example you create a roof in phase 1.
We are trying to find the quickest way to replace windows in a renovation project.
1 create all necessary phases.
We would like to have the plans of.
My first task is to delete all windows and doors and replace them with openings.
Element was created in the phase of the current view.
If you place an insert into a host in a phase later than the host s creation phase revit lt creates an infill element for earlier phases.
The existing windows the destruction plan with the existing windows in red the project plan with the new windows the problem is.
To access all phases options go to phases menu in the manage tab.
The first thing you need to do is set the phases you require.
Need to know correct workflow for managing phasing.
In most revit templates the basic phases are existing and new.
In the projet the idea is to demolish the existing windows keep the hole and place a new window on the outside of the wall.
Get the highest quality bim content you need from the manufacturers you trust.
So now i ve got a model from an architect company that i need to edit.
Wanting to know how to control the display of elements based on their phase status in revit.
For most project this is all you will need.
The wall infill s the demolished window and then when new window of same size location is added it confuses the model.
The issue at hand is the phase communication between the demo and new.
You add a skylight to the roof in phase 2.
Download window revit families for free with bimsmith.
A common mistake is to create a demolition phase.
I m doing a project for a construction company and i have to do a construction model in revit 2013.
Element was created in an earlier phase and continues to exist in.
You look at the roof and skylight in a 3d view.
By nature revit infill s the demo phase but the infill itself doesn t have a phase assigned.
The phase property of the inserts door or window opening can differ from the walls phase.
If different phase property values are assigned to host and insert an infill element will be created.