I have done 24 spacing with 16 o c.
Resilient channel ceiling spacing.
The gypsum association released a technical document ga 227 13 recommendations for the prevention of ceiling cracking their publication outlines methodologies for mitigating cracking in large span gypsum board ceilings due to fluctuations in temperature.
However if you are using 2 x layers of drywall spacing the resilient channel every 16 rdquo.
Single leg resilient channel made of 22mil steel rc deluxe is one of the most effective low cost methods of improving sound transmission loss through wood and steel frame partitions.
You want the ceiling to be able to float.
Don t hang your wall board tight to the ceiling.
For joists 406 mm 16 in o c and 406 mm o c.
While resilient channels are meant to be attached directly onto the studs sound clips provide an added checkpoint the vibrations need to pass before reaching the hat channel.
For ceilings the spacing is determined by the support framing.
Rc deluxe is the preferred resilient channel because of its extra wide 1 1 2 flange for the installation of the gypsum board.
As i have mentioned many people believe the sound clips and hat channels method to be a more effective decoupling.
Note that all of the lab test data with rc is based on 24 on center.
While we re not sure where the myth originates evidence shows that resilient channel attached to the underside of floor joists can successfully support two layers of 1 2 inch or 5 8 inch gypsum wallboard.
For joists 610 mm o c.
However in the field it is difficult to keep this spacing consistent.
For the resilient channel to do its job it needs to be away from the framing at the edges also.
Knurled face makes screw attachment of wallboard easier.
Will provide additional structural support with a minor loss in sound performance you probably wouldn rsquo t notice the difference.
610 mm 24 in o c.
However there s a myth that says resilient channel can t support multiple layers of gypsum wallboard in floor ceiling assemblies.
To function properly the resilient channel should be installed perpendicular to the support framing.
It is best to use 32 mm 1 in type w or s screws but never nails to fasten channels to joists.
If your ceiling joists are spaced every 16 rdquo.
Ranges over 24 are against the installation instructions while spans less than 24 ensure that the resilient channel will not be as effective as it is in the lab.
If you re looking to avoid ceiling cracking the industry s leading authority is recommending resilient channel as a solution.
Ink jetted to assist in proper installation orientation.
If the spacing of the support framing is 24 inches on center then the resilient channels should be 16 inches on center.
Joists with 5 8 type x with zero problems.
You can certainly space the resilient channel every 24 rdquo.
Resilient channels should be attached to the ceiling joists at right angles as follows.
Sound clips and hat channels.
Resilient channel should be installed perpendicular to the.